Thanks for visiting our new website! We are currently undergoing improvements. Please click here to see our Parts Diagrams like our old site!

Shop
100 items found.
Buyers
#16 OH RING
H916
0.83 0.83 0.8300000000000001 USD
SKID PLT WLDMT, UC, CAN-AM DFDR, XT, 16+ [BL
LTA12142-03
272.56 272.56 272.56 USD
Waltco Liftgate
KIT, MDL SPROCKET, 16 TOOTH
WAL80002233
121.80 121.80 121.8 USD
Waltco Liftgate
SB-16
SB-16
6,546.04 6,546.04 6546.04 USD
Buyers
18x16x90 Inch Diamond Tread Aluminum Topsider Truck Box
1701565
1,295.99 1,295.99 1295.99 USD
Lightweight, corrosion-resistant 0.100 in. thick aluminum construction.
Box contents are secured behind dual recessed drop doors with continuous hidden hinge.
Protect against weather and theft with the locking, die cast, compression latch system.
Aircraft-grade cables protect the hinge and doors from damage
Mounting hardware included. Choose a no-drill mounting option with the J-hooks and protective side-rail pads.
Made in the USA.
Buyers Products Diamond Tread Aluminum Topsider Truck Box provides a convenient and secure way to store your tools. The box mounts on your truck bed rails, keeping your tools easy to access and saving valuable storage space in the bed. These truck tool boxes are ideal for pick-up trucks, flatbed trucks, and service utility bodies.

Each truck box is constructed from 0.100 in. thick aluminum with dual, recessed drop doors. Corrosion-resistant diamond tread aluminum is durable but lightweight. A continuous hidden hinge and weather-resistant seal keep moisture and dirt away from your equipment. Aircraft-grade cables keep the door from slamming and damaging the hinge or doors. A locking die-cast T-handle compression latches create a tight seal and help deter theft.

Mounting hardware included. Choose a no-drill mounting option with the included J-hooks and protective side-rail pads.
Product Common Use: Pick up trucks, flatbed trucks, and service & utility bodies.
Maxon
CONNECTOR, PLUG 6 PIN, 16 GA
907012
25.06 25.06 25.060000000000002 USD
Maxon
RH 16" ARR ASSY, DUAL, ST. F/O BMRW
286845-202
965.52 965.52 965.52 USD
Boss
BKR PLT, UC, UTV, YAM WOL 700, 16+ [BLACK]
LTA13228-03
4.88 4.88 4.88 USD
Maxon
CABLE ASSY 2GA .31/.38 16" LG
283594-03
23.80 23.80 23.8 USD
TT 16 FRAME WELD NO/LIGHTS-80" PLAT.
31295-002
1,562.15 1,562.15 1562.15 USD
Buyers
18x16x96 Inch Diamond Tread Aluminum Topsider Truck Box
1701568
1,345.11 1,345.11 1345.1100000000001 USD
Lightweight, corrosion-resistant 0.100 in. thick aluminum construction.
Box contents are secured behind dual recessed drop doors with continuous hidden hinge.
Protect against weather and theft with the locking, die cast, compression latch system.
Aircraft-grade cables protect the hinge and doors from damage
Mounting hardware included. Choose a no-drill mounting option with the J-hooks and protective side-rail pads.
Made in the USA.
Buyers Products Diamond Tread Aluminum Topsider Truck Box provides a convenient and secure way to store your tools. The box mounts on your truck bed rails, keeping your tools easy to access and saving valuable storage space in the bed. These truck tool boxes are ideal for pick-up trucks, flatbed trucks, and service utility bodies.

Each truck box is constructed from 0.100 in. thick aluminum with dual, recessed drop doors. Corrosion-resistant diamond tread aluminum is durable but lightweight. A continuous hidden hinge and weather-resistant seal keep moisture and dirt away from your equipment. Aircraft-grade cables keep the door from slamming and damaging the hinge or doors. A locking die-cast T-handle compression latches create a tight seal and help deter theft.

Mounting hardware included. Choose a no-drill mounting option with the included J-hooks and protective side-rail pads.
Product Common Use: Pick up trucks, flatbed trucks, and service & utility bodies.
Waltco Liftgate
RAMP ASSY, 16" ALUM FOLDING
32415000
2,343.83 2,343.83 2343.83 USD
Maxon
ARR 16" GALV P/F 80"
285503-96
1,551.98 1,551.98 1551.98 USD
BOLT – TOP BRACKET ( 3/8 - 16 x 1/2 )
10-1073-2
0.55 0.55 0.55 USD
Buyers
16x13x88 Inch Diamond Tread Aluminum Topsider Truck Box
1701556
1,064.70 1,064.70 1064.7 USD
Lightweight, corrosion-resistant 0.100 in. thick aluminum construction.
Box contents are secured behind dual recessed drop doors with continuous hidden hinge.
Protect against weather and theft with the locking, die cast, compression latch system.
Aircraft-grade cables protect the hinge and doors from damage
Mounting hardware included. Choose a no-drill mounting option with the J-hooks and protective side-rail pads.
Made in the USA.
Buyers Products Diamond Tread Aluminum Topsider Truck Box provides a convenient and secure way to store your tools. The box mounts on your truck bed rails, keeping your tools easy to access and saving valuable storage space in the bed. These truck tool boxes are ideal for pick-up trucks, flatbed trucks, and service utility bodies.

Each truck box is constructed from 0.100 in. thick aluminum with dual, recessed drop doors. Corrosion-resistant diamond tread aluminum is durable but lightweight. A continuous hidden hinge and weather-resistant seal keep moisture and dirt away from your equipment. Aircraft-grade cables keep the door from slamming and damaging the hinge or doors. A locking die-cast T-handle compression latches create a tight seal and help deter theft.

Mounting hardware included. Choose a no-drill mounting option with the included J-hooks and protective side-rail pads.
Product Common Use: Pick up trucks, flatbed trucks, and service & utility bodies.
Buyers
14x16x24 Inch Diamond Tread Aluminum Underbody Truck Box
1705160
547.20 547.20 547.2 USD
Built tough with durable, corrosion-resistant, .100 in. thick diamond tread aluminum for extreme weather resistance.
Box contents are secured behind a recessed drop door with continuous hidden hinge.
Protect against weather and theft with the locking, die cast, compression latch system.
Can be mounted on either a flat surface or under-bed (under-bed installation requires mounting brackets, sold separately).
Built for long life with aircraft-grade cables and a replaceable gasket sealing system.
Made in the USA.
Protect and easily access your equipment with the Buyers Products Diamond Tread Aluminum Underbody Truck Box. Available in a variety of sizes, each box is made of strong, corrosion-resistant .100 in. thick aluminum.

The recessed drop door combined with the continuous hidden hinge and replaceable gasket system keep weather and grime away from your tools. Aircraft grade cables help prevent damage. The locking, die-cast compression latch provides a tight seal and deters theft.

Mount the box on any flat surface or under your truck using Buyers Products Mounting Brackets (sold separately, see "Accessories" below).
Product Common Use: Truck Equippers, Truck Installers, Truck Upfitters, Maintenance Professionals
Boss
SPINNER, BROADCAST, 16+
WBS15861
58.87 58.87 58.870000000000005 USD
Boss
PBSP, DR, NISSAN NAVARA, 16+ [BLACK]
PBA11241-03
87.99 87.99 87.99 USD
Buyers
16x13x96 Inch White Steel Topsider Truck Box
1702860
1,205.57 1,205.57 1205.57 USD
Durable 16 Ga body and 14 Ga steel doors construction with gloss white powder-coated finish.
Box contents are secured behind dual recessed drop doors with continuous hidden hinge.
Aircraft-grade cables protect the hinge and doors from damage.
Protect against weather and theft with the stainless-steel T-handle latches.
Mounting hardware included. Choose a no-drill mounting option with the J-hooks and protective side-rail pads.
Keep equipment and gear organized with an optional snap-in tray (refer to the “accessories" listed below).
Made in the USA.
Buyers Products White Steel Topsider Truck Box provides a convenient and secure way to store your tools. The toolbox mounts on your truck bed rails, keeping tools easy to access and saving valuable storage space in the bed. These truck boxes are ideal for pick-up trucks, flatbed trucks, and service utility bodies.

Each truck box is constructed from 16 Ga steel with 14 Ga recessed drop doors. The stainless-steel hinge and weather-resistant seal keep moisture and dirt away from your equipment. Aircraft-grade cables keep the door from slamming and damaging the hinge or doors. Locking stainless steel T-handle latches create a tight seal and help deter theft. The optional snap-in tool trays provide more options for sorting and storing tools and gear.

Mounting hardware is included. Choose a no-drill mounting option with the included J-hooks and protective side-rail pads.

Product Common Use: Pick up trucks, flatbed trucks, and service & utility bodies.