WBS15962 HOPPER, 100 LB, SS, BRCAST, 17+

WBS15962
WBS15962 Boss Boss

$ 393.03 393.03000000000003 USD $ 393.03

$ 457.01


    This combination does not exist.

    Add to Cart


    Share this product:

            
    • Structural steel construction with zinc prime & powder coated finish
    • interior body widths are 88″(EXT) & 87″(INT) and exterior width is 96″
    • Interior height is 72″ high
    • Floors are constructed of 10GA steel sheet with 3″ structural channel on 16″ centers
    • Posts are constructed of 12GA steel sheet; exterior posts are 5″ formed posts on 36″-48″ centers, Interior posts are 3″ structural channel on 16″ centers
    • Top rails are constructed of 3″ x 3″ x 1/8″ square steel tubing
    • Rear corner posts are constructed of 7GA steel
    • Roofs are constructed of 12GA steel with a 6″ peak
    • Lockable security-style doors with 3″ x 3″ supports
    • Standard 6″ steel ground rollers
    Recently viewed Products